The work party is, as usual, scheduled for 09:30 – 12:30 although the insane and those without a home to go to, work on into the afternoon. The work to be done includes:
1. Raking up the vegetation cut on Monday and if conditions allow, burning it.
2. Collecting the large stones littering the scrape area in front of the main hide to allow a membrane to be laid at a later date.
3. Collecting the bullrushes for composting.
Dag Marshall is running this work party so please contact him if you can make it (see below) as it is possible he may have to postpone it if his work commitments demand.
If you have a rake and/or fork, please bring them along.